Montaldo Apartments

Project Information

artist rendering of a 5 unit and 8 unit apartment buildings

Project Location: 19320 Sonoma Highway

Project Description: Residential development featuring 50 three-story residential apartment units with ground-floor entrances and garages, vehicle circulation, common open space, and landscaping. 25 percent of the project would be reserved for low-income households. Project would combine two existing parcels into a 2.15-acre lot and remove an existing single-family residential structure.

Contact

Planning Department:  Call (707) 938-3681 or Email

Project status updates and documents are provided below. Please note that large documents might not be previewed but can be viewed by clicking the "download" link.

Submit your email address to receive automatic project updates directly in your inbox.

  • SUBSCRIBE to receive notifications here:

Current Status & Project Timeline:

  • One May 5th, 2025, a Notice of Availability of a Draft Environmental Impact Report (EIR) and Initial Study was posted. The comment period is open from May 12 – June 25, 2025. Find EIR documents below.
  • On August 1, 2024, a Scoping Session will be held in City Council Chambers at 177 First Street West
  • On July 12, 2024, a Notice of Preparation (NOP) of a Draft Environmental Impact Report (EIR) was posted. The comment period is from July 12 through August 13.
  • On May 17, 2023, the City Council authorized the City Manager to execute a contract with Sertior Environmental Consulting to prepare an environmental analysis for the project.
    • Sertior is contracted to prepare an Initial Study to evaluate and identify any potential environmental impacts of the proposed project. Once the Initial Study is complete, a scoping session will be scheduled to present the results and allow for community input.
  • On August 12, 2022, the project submittal was deemed complete but subject to an environmental review, pursuant to CEQA.
  • On June 9, 2022, a proposal was submitted by DeNova Homes for a 7-building, 50-unit apartment complex containing a Design Review, Use Permit, Demolition Review, Landscape Review, and Sign Permit applications.
  • On September 9, 2021, a Study Session was conducted at the Planning Commission for a 55-unit multi-family residential development

Project Documents

NameDateDownload
Notice of Availability (NOA) of a Draft Environmental Impact Report (EIR) and Initial Study May 5, 2025 PDF (181 KB)
Draft EIR (Montaldo Project) May 5, 2025 PDF (12 MB)
Draft EIR – Appendix A, Initial Study (Montaldo Project) May 5, 2025 PDF (1.8 MB)
Draft EIR – Appendix B, Notice of Preparation (Montaldo Project) May 5, 2025 PDF (18 MB)
Draft EIR, Appendix C, Historical Resources Analysis and Supporting Information (Montaldo Project) May 5, 2025 PDF (9.5 MB)
Draft EIR – Appendix D, Health Risk Assessment (Montaldo Project) May 5, 2025 PDF (4.8 MB)
Draft EIR – Appendix E, Biological Resources (Montaldo Project) May 5, 2025 PDF (25 MB)
Draft EIR – Appendix F, Archaeological Resources Management Report (Montaldo Project) May 5, 2025 PDF (3 MB)
Draft EIR – Appendix G, Traffic Impact Study (Montaldo Project) May 5, 2025 PDF (4.1 MB)
Draft EIR – Appendix H, Tribal Consultation AB 52 (Montaldo Project) May 5, 2025 PDF (1.2 MB)
Notice of Preparation, Environmental Impact Report – Montaldo Apartments July 12, 2024 PDF (18 MB)
Tree Inventory Report – Montaldo Apartments July 12, 2024 PDF (3.4 MB)
Additional Project Information – Montaldo Apartments July 12, 2024 PDF (435 KB)
Pre-construction Survey Results – Montaldo Apartments July 12, 2024 PDF (167 KB)
Geotechnical Investigation – Montaldo Apartments July 12, 2024 PDF (4.4 MB)
Historic Resource Evaluation – Montaldo Apartments July 12, 2024 PDF (6.6 MB)
Plan Set – Montaldo Apartments July 12, 2024 PDF (21 MB)
Soil Analysis Report – Montaldo Apartments July 12, 2024 PDF (1.3 MB)
Traffic Impact Study – Montaldo Apartments July 12, 2024 PDF (3.9 MB)
Biological Technical Memo – Montaldo Apartments June 16, 2022 PDF ()
Close window